Call Us

0845 880 3627

Email Us

Sales@Midlandminipiling.co.uk

HOME

ABOUT

SERVICES

PROJECTS

GALLERY

CONTACT

Services

FIND MORE INFORMATION ON THE SERVICES WE OFFER BELOW.

150mm Steel Cased Mini Pile

Overview:
For installation of 150mm diameter steel piles, we use the bottom driven grundomat system.

​Advantages:

> Ability to drive piles in otherwise inaccessible areas.
> Install piles to a given depth with minimum noise/vibration.

​Applications:

> Small to large domestic extensions.
> Cantilever Underpinning
> Piled Raft Underpinning

​Technical Specification:

100 KN (10 TONNE) SWL (Safe Working Load) Achievable
202KN (20.2 TONNE) Proven Load
10m MAXIMUM Depth Achievable. (Due To Sle

150mm Steel Cased Mini Pile

Overview:
For installation of 150mm diameter steel piles, we use the bottom driven grundomat system.

​Advantages:

> Ability to drive piles in otherwise inaccessible areas.
> Install piles to a given depth with minimum noise/vibration.

​Applications:

> Small to large domestic extensions.
> Cantilever Underpinning
> Piled Raft Underpinning

​Technical Specification:

100 KN (10 TONNE) SWL (Safe Working Load) Achievable
202KN (20.2 TONNE) Proven Load
10m MAXIMUM Depth Achievable. (Due To Sle

220mm Steel Cased Piling Tubes

Overview:
For installation of 220mm diameter steel piles, we use the bottom driven piling rig system.

​Advantages:

> Install piles to a given depth with minimum noise/vibration.
> Complies with latest NHBC regulations.

​Applications:

> New Builds
> Medium to Large Commercial Projects.
> Piled Raft Underpinning
> Cantilever Underpinning

​Technical Specification:

250 KN (25 TONNE) SWL (Safe Working Load) Achievable.
FOS 2.0 = 500 KN (50 TONNE) Proven Load.
20m MAXIMUM Depth Achievable.

220mm Steel Cased Piling Tubes

Overview:
For installation of 220mm diameter steel piles, we use the bottom driven piling rig system.

​Advantages:

> Install piles to a given depth with minimum noise/vibration.
> Complies with latest NHBC regulations.

​Applications:

> New Builds
> Medium to Large Commercial Projects.
> Piled Raft Underpinning
> Cantilever Underpinning

​Technical Specification:

250 KN (25 TONNE) SWL (Safe Working Load) Achievable.
FOS 2.0 = 500 KN (50 TONNE) Proven Load.
20m MAXIMUM Depth Achievable.

200/250/300mm Augered Piling

Overview:
In-house T5000 Auger Piling Rig.

​Advantages:

> Ability to reach required depths where conventional piling is unsuitable
> Ability to auger to depths of up to 10m
> Ability to auger in otherwise inaccessible areas due to detachable engine section and retracting tracks

200/250/300mm Augered Piling

Overview:
In-house T5000 Auger Piling Rig.

​Advantages:

> Ability to reach required depths where conventional piling is unsuitable
> Ability to auger to depths of up to 10m
> Ability to auger in otherwise inaccessible areas due to detachable engine section and retracting tracks

CFA Piling

Overview:
Soilmec CM48 CFA Piling rig

​Advantages:

> Able to drill 300mm upto 600mm holes 24.5m deep.
> Hollow stem injected concrete through the centre of the drill bits leaving a fully constructed pile on withdrawal of the drill bits.

Computer monitored.

CFA Piling

Overview:
Soilmec CM48 CFA Piling rig

​Advantages:

> Able to drill 300mm upto 600mm holes 24.5m deep.
> Hollow stem injected concrete through the centre of the drill bits leaving a fully constructed pile on withdrawal of the drill bits.

Computer monitored.

Power Floating

Overview:
We can boast having skilled power float handlers and our own floats for every application.

​Power Floats:

> Whitemans pedestrian Finisher
> Whiteman Ride-on Overlapper

Power Floating

Overview:
We can boast having skilled power float handlers and our own floats for every application.

​Power Floats:

> Whitemans pedestrian Finisher
> Whiteman Ride-on Overlapper

Rebar / Steel Cage Fabrication

Overview:
Fabrication of Pile Caps, drop bars, splice bars, corner bars and cages.

​Advantages:

> Ability to Produce precise amounts of steel work for each project
> Fast Turn Around.
> Cost Effective
> Delivered

Rebar / Steel Cage Fabrication

Overview:
Fabrication of Pile Caps, drop bars, splice bars, corner bars and cages.

​Advantages:

> Ability to Produce precise amounts of steel work for each project
> Fast Turn Around.
> Cost Effective
> Delivered

Pile Integrity Testing

Overview:
In house TDR-2 pile signal analyser.

Pile Integrity Testing

Overview:
In house TDR-2 pile signal analyser.

Hire Us

Call Mark Today To Get Your Free, No Obligation Quote!

Request a Quote